Designing Structures to Remove Phosphorus from Drainage Waters

Waste to Worth: Spreading science and solutions logoWaste to Worth home | More proceedings….

Abstract

Several groups have developed P removal structures, which are units filled with P sorbing materials and designed to channel runoff water through them while retaining the filter material and P.  The goal is to prevent P from entering a surface water body and allow filtered P to be removed from the watershed after the P-saturated material is removed. …